Entrance Station Improvements Update
Amy Knopp, Manager, Rueter-Hess, gave a presentation on the recent improvements to
the entrance station. Staff also explained the additional improvements to the drainage and
the erosion at the overflow parking lot.
The new entrance station building is moving through the permitting process with the
County. Staff will continue to work with the vendor and the County until completion.
Asphalt may be coming in June.
Dock Update
b.
c.
Staff updated the RAB on the dock installation.
The first of three docks was installed on April 10th, the remaining two will be installed
over the next few weeks, weather permitting.
Aqua Sierra Conservation and Fish Assessment 2024 Overview
Amy Knopp, Manager, Rueter-Hess, shared the Aqua Sierra Conservation and Fish
Assessment 2024 Overview.
Recommended new fishing guidelines after July 1, 2025:
• Allowable Tackle
o Treble hooks
o Scented artificial baits
o Barbed hooks
o Power Bait (no live bait)
• Catch and Keep Slot Sizes and Bag Limits
· Walleye
o
o
Keep Slot Size16 - 20 inches
Bag Limit 2
· Largemouth Bass
o
o
Keep Slot Size 14 - 18 inches
Bag Limit 1
· Perch
o
Keep Slot Size > 6 inches
Bag Limit 5
o
• 100 adult anglers per week
Ron Redd, PWSD, informed the RAB that an oxygen infuser will be installed this
summer at the reservoir.
Rock piles were placed on the shore last fall as future fish habitat. As the water level
rises the rocks will be submerged creating new habitat for the fish. More rock may
become available from other locations.